Evolution of Volta, Pt. 5

Things are moving much faster now. The plumbing has been replumbed and inspected. The entire electrical service has been rearranged and relocated as necessary. Sheet rock work begins today. The crew at Meta-Res sent along a projection of the bar with the final casework in place, and we're already assembling the kits.

As a point of reference, check out M'lissa's original sketch from last fall.

Sunday morning meetings with our contractor, Fredrik Wetterqvist, and Meta-Res' Stephen Bender have been key with moving things along as we brainstorm on design, materials, and construction. As a collaborative endeavor, the entire build-out process has been a very rewarding exchange of ideas and pooling of talent.

Janet and Stephen

Fredrik and Stephen plot out space for the Cirqua